Design Development – A maximum of 3 drawing revisions
Floor to floor height – 9′
Steel (500 TMT Bars) – Bhuwalka/Kamadhenu
Cement (Grade 43 or 53 as needed) – Penna/Dalmia
UG Sump built with solid blocks of 6” thickness & waterproof plastered 6000 lts
Concrete – M20 grade RMC
Solid Block walls – 6” & 4” thickness
Internal, external and toilet wall – column joints plastering with chicken mesh
Waterproofing compound – Dr.Fixit/FOSROC for external walls
Cement based waterproofing
Steel/concrete lofts – Not included
Anti termite treatment
Working drawing for all works
Schedule of Openings
Section and Elevation
2D Furniture layout
Structural Design as per IS Code.
Good for construction drawings
Soil Test report
Electrical Layout
Plumbing Water Line Layout
Plumbing Drainage Line Layout
Radi Construction will provide liaison assistance with different government agencies, obtain permissions, licenses & sanction fee for the following (if applicable)
Conduits – Good quality, hidden in slabs and walls
Copper wire –Anchor
External electrification is included
Switches & Plates – Anchor – Ziva make
A main DB & MCB – IndoAsian make
One UPS point for the house
Water supply system – Internal & External
Connection for water inlet from corporation
External sewage system – Inspection chambers & sewage outlet to site boundary
Class B CPVC pipes – Astral/Supreme make
Solar & Geyser Provision
Rain water harvesting facility – Ground water recharge
PVC Overhead Tank – Ganga or Equivalent make of basic price Rs 6.5 per litre
Kitchen sink with accessories : SS – Rs.4500/- per kitchen
CP & Sanitary fixtures such as Wash Basin, WC, Taps and other accessories like bottle trap, gratings etc. : Hindware/Cera – Rs.20,000/- per bathroom attached toilet
Electrical fixtures – Not Included
Doors – Main Door : Teak Wood frame & shutter including hardware – Rs.20,000/- per door
Internal Doors : Any wood frame & shutter including cost of hardware – Rs.8,000/- per door
Internal Door frames & shutters – Painted (only)
Main Door – Polished by hand
Bathroom, Terrace & Utility Door – Frame & shutter including hardware – Rs.7,500/- per door
Door hardware – Ozone/Europa/Dorma make.
Door hinges – SS hinges
Door & Door Frame cost – Inclusive of planing, rebate, transportation etc.
Aluminium windows – 5mm clear glass with MS Grills
Basic price : Alujminium/uPVC window including MS grills – Rs 400/- per Sqft
Main Gate: MS Gate – Rs.330/- per Sqft
External staircase & balcony railing : MS Railing – Rs. 550/- per Rft
Internal staircase railing : SS Railing – Rs.840/- per Rft
Utility grill is not included in the package
Readymade/ Pre-cast Compound wall – Maximum thickness of 3″ (If charged)
The compound wall is painted
Excavation, Foundation, PCC, Size Stone Masonry with DPC course above SSM
Height of compound – 5 Feet
This proposal includes basic elevation design for your home
A 3D elevation is presented for client to choose from & design
Elevation can be designed & more elements may be added at very nominal cost to the design
Government fees for the liaison bodies to be paid directly by the client
The complete fee payment for plan sanction in Panchayat limits need to be borne by client
Assuming the site & road level to be equal, if the ground level needs to be raised above 18”, it shall be charged for accordingly
Hard rock/soft rock excavation, if it arises shall be charged for accordingly
Buying new earth/sending existing earth for excavation/backfilling purpose shall be charged on actual
Basic price of Cement is Rs.350/- per bag & Steel is Rs.50,000/- per MT. Any increase in these prices shall be charged accordingly
Percentage of opening for door & windows – 12% Maximum
Any work not mentioned within this package or outside the site boundary shall be charged for accordingly
One point of Electricity & water needs to be provided by the client free of cost to facilitate construction
SBC of soil is considered at 180 KN/M2 and depth of the foundation considered at 5 Feet, any increase in depth shall be charged accordingly on actuals upon site conditions
If there is constraints in material delivery or socking place and materials to be order in small quantities, the additional charges for the same shall be charged on actuals
A specific area to construct labour and material shed needs to be provided within 50 feet from the construction place by the client
Any road cutting charges for the connection of Electricity and Sewage lines is not included, such works shall be charged additionally
NOTE: The above mentioned material specifications are generalized, the inclusion or the exclusion of the same shall vary depending on the floor plan.
A customized payment schedule will be shared based on project specifications.
Construction guarantee – 1 Year ; Waterproofing warranty – 10 Years
Design Development – A maximum of 3 of drawing revisions per drawing
Basic Internal Isometric Views of the floor plan
Visual site survey & drawing on the basis of measurement provided by client
Floor to floor height – 10′
Steel (500 TMT Bars) – Bhuwalka/Kamadhenu
Cement (Grade 43 or 53 as needed) – Penna/Dalmia
UG Sump built with solid blocks of 8” thickness & waterproof plastered 7 000 lts
Concrete – M20 grade RMC
Solid Block walls – 6” & 4” thickness
Internal, external and toilet wall – column joints plastering with chicken mesh
Waterproofing compound – Dr.Fixit/FOSROC for external walls
Cement based waterproofing, waterproofing in terrace to avoid leakage
Steel/concrete lofts – Not included
Ledge wall for incorporating concealed sanitary parts – Included
Anti termite treatment
Working drawing for all works
Schedule of Openings
Section and Elevation
Complete 3D design interiors, only if executed by buildAhome.
2D Furniture layout
Assisting in interior procurement
Structural Design as per IS Code.
Good for construction drawings
Soil Test report
Design Analysis Report
Electrical Layout
Plumbing Water Line Layout
Plumbing Drainage Line Layout
Radi Construction will provide liaison assistance with different government agencies, obtain permissions, licenses & sanction fee for the following (if applicable)
Construction Plan Sanction
Temporary Electricity connection
Permanent electrical connection
Water connection
Sewage connection
Kitchen, Dining & Bedrooms : Vitrified Tiles – Rs.60/- per Sqft. Maximum tile size is 2’ X 2’.
Living Room, Foyer : Marble finished vitrified tiles -Rs.70/- per Sqft maxim tile size 2′ x 4′.
Staircase : Granite – Rs.100/- per Sqft
Balcony, Sit-out, Passage & Common areas : Anti-skid tiles – Rs.55/- per Sqft
Toilet Floor : Anti-skid tiles – Rs.50/- per Sqft
Toilet Wall Dado (Up to 7ft height) : Light & Highlighting tiles – Rs.45/- per Sqft
Parking Area, setback area (if charged) tiles – Rs.35/- per Sqft
Kitchen counter top : Granite – Rs.120/- per Sqf
Kitchen Wall Dado (Up to 2’ above counter) : Backsplash tiles – Rs.50/- per Sqft
CP & Sanitary fixtures such as Wash Basin, WC, Taps and other accessories like bottle trap, gratings etc. : Jaquar/Hindware – Rs.22,000/- per bathroom attached toilet and Rs.8,000/- per powder room (if applicable)
Electrical Fixtures – Not included
Main, Puja Door – Teak Wood frame & shutter including hardware – Rs.25,000/- per door
Internal Door – Sal wood frame & flush shutter including hardware – Rs.9,000/- per door
Internal door frames & shutter – Painted (only)
Main, Puja Door – Polished with melamine by hand
Bathroom Door – Frame & shutter including hardware – Rs.8,000/- per door
Door Hardware – Ozone/Europa/Dorma make
Door Hinges – SS hinges
Door & Door Frame cost – Inclusive of planing, rebate, transportation etc.
UPVC windows – 5mm clear glass with MS Grills
Basic price : uPVC with MS grill – Rs.510/- per Sqft (If required, upgrade to wooden windows can be made at an additional cost per Sqft, measured on built-up area. The additional cost can be calculated based on the wooden material chosen by the Client.)
Main Gate: Designer Gate– Rs. 350/- per Sqft
External staircase & balcony railing : MS Railing – Rs. 600/- per Rft
Internal staircase railing : SS Railing – Rs.900/- per Rft
Utility grill is not included in the package
Compound wall – Solid block walls of 4” thickness to suit the elevation (If charged)
Excavation, Foundation, PCC, Size Stone Masonry with DPC course above SSM
Height of Compound wall – 5 Feet
Compound wall – Plastered & Painted
This proposal includes aethetically pleasing elevation
A 3D elevation is presented for client to choose from & design further
A design if needed to be modified more than thrice shall be charged for accordingly
Government fees for the liaison bodies to be paid directly by the client
The complete fee payment for plan sanction in Panchayat limits need to be borne by client
Assuming the site & road level to be equal, if the ground level needs to be raised above 18”, it shall be charged for accordingly
Hard rock/soft rock excavation, if it arises shall be charged for accordingly
Buying new earth/sending existing earth for excavation/backfilling purpose shall be charged on actual
Basic price of Cement is Rs.380/- per bag & Steel is Rs.60,000/- per MT. Any increase in these prices shall be charged accordingly
Percentage of opening for doors & windows – 20% of built up area Maximum
Any work not mentioned within this package or outside the site boundary shall be charged for accordingly
One point of Electricity & water needs to be provided by the client free of cost to facilitate construction
SBC of soil is considered at 180 KN/M2 and depth of the foundation considered at 5 Feet, any increase in depth shall be charged accordingly on actuals upon site conditions
If there is constraints in material delivery or socking place and materials to be order in small quantities, the additional charges for the same shall be charged on actuals
A specific area to construct labour and material shed needs to be provided within 50 feet from the construction place by the client
Any road cutting charges for the connection of Electricity and Sewage lines is not included, such works shall be charged additionally
NOTE: The above mentioned material specifications are generalized, the inclusion or the exclusion of the same shall vary depending on the floor plan.
A customized payment schedule will be shared based on the project specifications.
Construction guarantee – 1 Year ; Waterproofing warranty – 10 Years
Radi Construction will provide liaison assistance with different government agencies, obtain permissions, licenses & sanction fee for the following (if applicable)
Construction Plan Sanction
Temporary Electricity connection
Permanent electrical connection
Water connection
Sewage connection
Kitchen & Bedrooms – Vitrified Tiles – Rs.80/- per Sqft.
Main Living Room, Dining – Italian Marble/Premium Finished Vitrified tiles of 4’x8’ dimension -Rs.400/- per Sqft
Staircase, Foyer Area granite – Rs 135 (Only granite)
Balcony, Sit-out, Passage & other common Areas – Anti-skid tiles – Rs.65/- per Sqft
Unlimited light and power points in good design sense
Conduits – Good quality, hidden in slabs and walls
Fire retardant copper wire – Havells
AC provision – in all rooms
Switches & Plates – Legrand Britzy or equivalent make
External electrification is included
Switches & Plates – Legrand Britzy or equivalent make (Touch screen switch provision only)
A main DB & MCB – ABB/Schneider/Legrand make
Provision for home automation is included
One Electric Car charging point – Parking area
One UPS point for the home
Water supply system – Internal & External Connection for water inlet from corporation.
Separate bore well & corporation lines, if needed for Kitchens. If separate tank is needed, shall be charged on actuals
External sewage system – Inspection chambers & sewage outlet to site boundary
Class B CPVC pipes – Ashirwad/Astral make
Solar & Geyser Provision
Rain water harvesting facility – Ground water recharge
PVC Overhead Tank based on per capita consumption from Sintex
FRP Chamber covers shall be provided for IC
Separate sewage & drainage lines
Separate hot & cold water lines for sink
Kitchen sink & Accessories: SS/Granite/Carysil – Rs.15,000/- per kitchen
CP & Sanitary fixtures such as Wash Basin, WC, Taps and other accessories like bottle trap, gratings etc. : Jaquar/Hindware – Rs.35,000/- per bathroom attached toilet and Rs.15,000/- per powder room (if applicable)
Electrical Fixtures – Not included
Main, Puja Door – Teak Wood frame & shutter including hardware – Rs.50,000/- per door
Internal Door – Sal wood frame & flush shutter including hardware – Rs.11,000/- per door
Internal door frames & shutter – Painted
Main, Puja Door – Polished with melamine spray
Bathroom Door – Frame & shutter including hardware – Rs.9,000/- per door
Door Hardware – Ozone/Europa/Dorma make
Door Hinges – SS hinges
Door & Door Frame cost – Inclusive of planing, rebate, transportation etc.
UPVC windows of Kommerling or equivalent make – 5mm clear glass with MS Grills
Basic price: uPVC of with MS grill or wooden including hardware – Rs.690/- per Sqft OR Wooden windows – Sal wood Frame (5”x3”) & Honne Shutter (1.5” thickness) with clear glass and grill rods
Main Gate: Designer Gate – Rs. 450/- per Sqft
External staircase & balcony railing : MS Railing – Rs. 660/- per Rft
Internal staircase railing : SS Railing – Rs.1080/- per Rft
Utility grill is not included in the package
Waterproofing is included for Utility & balcony portions
Compound wall – Solid block walls of 4” thickness to suit the elevation (If charged)
Excavation, Foundation, PCC, Size Stone Masonry with DPC course above SSM
Height of Compound wall– 5 Ft
Compound wall – Plastered & Painted
This proposal includes a luxurious elevation
A 3D elevation is presented for client to choose from & design further
A design if needed to be modified more then 40 shall be charged accordingly
Government fees for the liaison bodies to be paid directly by the client
The complete fee payment for plan sanction in Panchayat limits need to be borne by client
Assuming the site & road level to be equal, if the ground level needs to be raised above 18”, it shall be charged for accordingly
Hard rock/soft rock excavation, if it arises shall be charged for accordingly
Buying new earth/sending existing earth for excavation/backfilling purpose shall be charged on actual
Basic price of Cement is Rs.410/- per bag & Steel is Rs.65,000/- per MT. Any increase in these prices shall be charged accordingly
Any work not mentioned within this package or outside the site boundary shall be charged for accordingly
Percentage of openings for doors & windows – 25% Maximum
One point of Electricity & water needs to be provided by the client free of cost to facilitate construction
SBC of soil is considered at 180 KN/M2 and depth of the foundation considered at 5 Feet, any increase in depth shall be charged accordingly on actuals upon site conditions
If there is constraints in material delivery or socking place and materials to be order in small quantities, the additional charges for the same shall be charged on actuals
A specific area to construct labour and material shed needs to be provided within 50 feet from the construction place by the client
Any road cutting charges for the connection of Electricity and Sewage lines is not included, such works shall be charged additionally
NOTE: The above mentioned material specifications are generalized, the inclusion or the exclusion of the same shall vary depending on the floor plan.
A customized payment schedule will be shared based on the project specifications.
Construction guarantee – 1 Year ; Waterproofing warranty – 10 Years